Offer
Provide additional details about the offer you're running.
See model specifications here: https://www.ktc-air.com/en/products/two_stage/dct_2s_series_double_stage_compressor_unit.html
---
Energy saving cost considering an average load of 70% corresponding to approximately 8000 hours at € 0.12 per kWh.
Possible energy saving cost
Energy wasted during unloading Energy wasted during loading.
See model specifications here: https://www.ktc-air.com/en/products/two_stage/dct_2s_series_double_stage_compressor_unit.html
---
Energy saving cost considering an average load of 70% corresponding to approximately 8000 hours at € 0.12 per kWh.
Possible energy saving cost
Energy wasted during unloading Energy wasted during loading.
"Their commitment is unmatched, and their sales approach is outstanding ... Their dedication and care truly set them apart, delivering the best service one could ask for."
"Great folks ... they rose to the occasion and got it completed and back in the field. Will gladly recommend to all my industry contacts and colleagues!"
"I have been very happy with my experience dealing with Airtek systems for the past year. They are always very fast to help me with any issues I come across, minimizing downtime and increasing productivity."